While this analyses the Texan and American views, the lessons from it are universal.

Three Perfect Storms?

Three severe winter storms swept across America in the period February 10-20, 2021. While causing many problems across the country, in Texas they caused widespread blackouts, affecting almost the entire population in rolling brown-outs and total blackouts, peaking at 4.5 million at a time on 16th February. The power system collapse was due to failures in nuclear, coal and gas-fired power stations (totalling about 40% of generation capacity) and the grid; some wind farms also seized up but they are such a small part of the energy mix that this was largely irrelevant. However that fact didn’t prevent die-hard climate-change deniers trying to blame the energy transition for the black-outs.

The immediate reaction was to blame human error and to call for heads to roll. But we believe that these are kneejerk reactions that miss the point: the cause was actually systemic – legislative and regulatory.

A Crisis Foretold

While many people claimed that such freezing weather in Texas is so extraordinary as to be unpredictable, there was “a similar series of outages almost exactly a decade ago” in February 2011. Indeed, such storms are an occasional feature through Texan history, and climate change is making such extreme weather events increasingly frequent. Subsequent legislation and regulations required power generation and fuel delivery equipment / infrastructure to provide reserve generating capacity and to winterise.

However the Texan energy market is very lightly legislated and regulated, so there was little that the authorities could do to enforce these actions, or to penalise inaction. Trading is almost entirely for energy, so there is no remuneration for value-added services such as reliability and reserve. And trading is exclusively for short-duration contracts which can most cheaply be fulfilled by patching up clapped-out fully-amortised plants rather than building new ones or investing in upgrades; to pay for such investments, longer-duration contracts are needed: we have analysed this before, in further detail.

An Isolated Grid

Texas’ grid is isolated from those of the rest of the country, deliberately, in order to avoid federal oversight under constitutional inter-state trade provisions. And the rest of America didn’t suffer similar blackouts despite enduring the same storms. So many have contended that the solution is to interconnect the grid with the rest of the country.

This is another kneejerk reaction that misses the point. The rest of the country’s grids were strained by the same storms, and didn’t have surpluses to export. Moreover, the rest of the country survived because they had winterised, as Texas hadn’t.

Breakthrough Energy Scenarios (see below) claims that, "A sunny day in southern California could provide power on a windless day in the Midwest", is falling into the common trap of considering normal times. There are periods (such as the recent cold weather over the entirety of contiguous USA) where there is no (or insufficient) renewable generation in one corner of the country to compensate for a lack in another, no matter how well interconnected. REBA Institute’s analysis “Designing the 21st Century Electricity System” makes the same mistake.

Even if it were possible to guarantee that renewable energy will generate in some corner of the country when not generating in others (which is the justification behind the European Union’s very expensive headlong dash for interconnectivity), building a grid to accommodate this would be prohibitive both financially and environmentally. First, there would have to be an enormous over-build of renewable generation capacity in each corner of the country, to generate enough to make up for occasional under-generation elsewhere. Secondly, the interconnection capacity would have to be sufficient to carry all the energy that is needed in the low-generation part of the country – hundreds of gigawatts in each direction.

For this reason the proper role of interconnectors is not to provide such basic resilience. Therefore the solution must have enough storage to power every part of the grid for as long as such weather patterns last.

Consumer Engagement

Texas has had Smart Meters for many years which, combined with its energy-only market, led to large-scale consumer (demand-side) involvement with flexible tariffs, which provides a degree of levelling of peak and trough demand; this is an aspiration in many other markets. However the black-outs demonstrated that, while they provide operational benefits, such measures do nothing for the strategic development of the grid, or for development of its Net Zero, balancing, ancillary and stability needs. The limitations of such an approach must be recognised and counteracted by well-balanced market and strategy.

The Energy Transition – the first 70%

As reported by Bloomberg, a model from Breakthrough Energy Sciences (BES) (a division of the Gates-founded organization that works to promote innovation that will help eliminate greenhouse gas emissions) states that “at a cost of $1.5 trillion, the U.S. could reach 70% carbon-free electricity and reduce its emissions by 42% by 2030. All four scenarios require a massive scale-up of wind and solar farms; the main difference is how the energy is distributed along power lines. And, crucially, decarbonization of the grid will have to happen even as it has to be made more resilient to extreme weather events that will increase in frequency.”

“Ultimately, we need to find ways to make the grid more robust to all of these kinds of challenges,” said Dhileep Sivam, vice president of BES. “This report is really a call to action to do that.”

The Energy Transition – the final 30%

Moreover, this looks at the first (and easiest) 70% of decarbonisation, which they already cost at $1.5trn. It’s the last 30% that is the difficult and expensive part: the entire difference in electricity supply is likely to be powered by asynchronous, intermittent renewables – especially wind and solar, but also tidal, wave and other. By this time there will remain little or no scope for further increases in hydro, biomass or syngas from anaerobic digestion: these are all part of the easier first 70%. And the grids will be saturated with intermittency, again by the first 70%. So the last 30% will need sufficient grid and non-grid assets to accommodate intermittency, balancing and stability. Unless a very large proportion of the renewables (including from the first 70% of the transition) are connected to the grid through large-scale long-duration inertial storage, the grid must be sized to accommodate:

Weather-related supply peaks

In weather-variable locations, as well as

Procuring the balancing and stability services from new plants built elsewhere,

Connecting those to the grid, and

Reinforcing the grid between those connections and the renewable generation connections.

In a different report, Bloomberg states "The existing network just isn’t sufficient to achieve the scale of wind and solar power that Biden needs, says Jesse Jenkins, an assistant professor at Princeton University. Getting to a fully green grid “would require a new nation-building mode like we haven’t seen since probably the post-war period, when we built the highways and did rural electrification.” He estimates that the U.S. needs to expand its transmission grid by as much as 60% for wind and solar to make up half of U.S. electricity capacity by 2030."

If that's what's needed by 2030, how much is needed by 2050? Without sufficient suitably located large-scale long-duration inertial storage, the answer is both financially and environmentally prohibitive.

Much cheaper and more efficient, as well as more stable reliable and resilient, is to build the balancing and stability services where they’re most needed: before the disturbances (from intermittent renewables) get onto the grid. As the REBA Institute’s article says, "Wind, solar, and storage increase the capacity value of each other, so that their combined capacity value is greater than the sum of their parts", but only if the scale and duration of storage is big enough.

Building for 2050

Moreover, the assets required to do this (as well as to do the first 70%) are long-lived assets. This means that those we build now will still be operational in 2050, less than 30 years hence. So all new assets built now must be 2050 (zero-carbon) compatible, or we will be building in additional obsolescence, cost and disruption into the energy transition.

The REBA Institute states that "The power system has always used a portfolio of generation technologies because few resources economically offer all three of the primary services necessary for reliability: energy, firm (or “dispatchable”) energy, and flexibility." Storelectric’s CAES offers all of that as (to a lesser extent) do most other large-scale long-duration electricity storage technologies.

And while the REBA Institute is correct that "It is not always feasible nor efficient for each customer to match their individual load and clean energy purchasing by time and location.", they fail to see that the same applies to storage: relying on the grid for back-up is both more feasible and more efficient. So the question is: "what's on the grid providing that back-up?" Only large-scale, long-duration, inertial storage.

Notes to Editors

About Storelectric
Storelectric (www.storelectric.com) is developing transmission and distribution grid-scale energy storage to enable renewables to power grids reliably and cost-effectively: the world’s most cost-effective and widely implementable large-scale energy storage technology, turning locally generated renewable energy into dispatchable electricity.
Innovative adiabatic Compressed Air Energy Storage (Green CAES TM) will have zero / low emissions, operate at 68-70% round trip efficiency, levelised cost significantly below that of gas-fired peaking plants, and use existing, off-the-shelf equipment.
Hydrogen CAES TM technology converts & gives new economic life to gas-fired power stations, reducing emissions and adding storage revenues; hydrogen compatible.

Both technologies will operate at scales of 20MW to multi-GW and durations from 4 hours to multi-day. With the potential to store the entire continent’s energy requirements for over a week, global potential is greater still. In the future, Storelectric will further develop both these and hybrid technologies, and other geologies for CAES, all of which will greatly improve storage cost, duration, efficiency and global potential.

About the Author
Mark Howitt is Chief Technical Officer, a founding director of Storelectric. He is also a United Nations expert advisor in energy transition technologies, economics, regulation and politics – invitation here – and advisor to other bodies too.

A graduate in Physics with Electronics, he has 12 years’ world-wide management and innovation consultancy experience. In a rail multinational, Mark transformed processes and developed 3 profitable and successful businesses: in commercialising a non-destructive technology he had innovated, in logistics (innovating services) and in equipment overhaul. In electronics manufacturing, he developed and introduced to the markets 5 product ranges and helped 2 businesses expand into new markets.